Freshwater Fish New Wastewater Treatment System

Project Description

A New Wastewater Treatment Facility

The project included complete site preparation and installation of a pre-engineered building in Winnipeg, Manitoba. The wastewater treatment facility installation included foundation, site grading, HVAC and electrical. CPI also supplised and installed the necessary equipment and accessories, including Centrifugal pumps (Transfer Pumps, Service Water Pumps, Effluent Pumps, Sludge Pumps) and piping, a SAF System, EQ Tank, Transfer Tank and Sludge Tank inside the building. CPI provided all materials, labor and equipment necessary to provide FFMC with a complete and functional system, and completed all performance and reliability runs prior to project handoff.

Operational During Construction

The existing plant was operational during construction and all efforts were made to safeguard their continued operation. CPI coordinated all construction activities for the wastewater treatment facility through the engineer and with operations staff to verify activities would interfere with the operation of the facility. Work was completed in phases to allow for continuous occupancy and uninterrupted operation and maintenance during construction.

Lets Build Together!

Contact Us
Con-Pro Canada