Skip to content
Back to Projects

Starbucks Canada – Corydon Avenue

Project Description

Project was a full-scale renovation of an existing space, including washroom facilities. It included the demolition and retrofit of the existing 1,720 square foot space to create a new location for Starbucks Canada. This project had an accelerated schedule and required consistent on-site management for completion. Starbucks Canada had a very specific project completion date in mind and CPI worked diligently to achieve it.

The project site was located on a busy intersection in a very walkable neighbourhood in Winnipeg. Care had to be taken to minimize disruption to the public walkways while also considering pedestrian safety. CPI used protected walking paths for the public. The scope of work included painting, new signage, additional lighting, gas line relocation and additions and mold remediation.New gypsum board walls and ceilings were provided along with acoustical ceilings. All new millwork was installed, along with finished carpentry components. New ceramic tile floors were supplied and installed along with specialty Eco-Grip commercial flooring. All new paint along with special art features, as well as full upgrades to mechanical and electrical.

Are you looking to start a new career?

Apply Today
Con-Pro Canada